Broadford Wwtp
BY-JAS Engineering's Aerator completely accumulated and is being raising into the lagoon. In 1987 BY-JAS Engineering's aerator was installed and the bridge construction has changed to a only piece of RHS in place of the ladder style frame described in the photo